• Entrar
    Ver item 
    •   Página inicial
    • Graduação
    • Engenharia Civil
    • Trabalhos de Conclusão de Curso (TCC)
    • Ver item
    •   Página inicial
    • Graduação
    • Engenharia Civil
    • Trabalhos de Conclusão de Curso (TCC)
    • Ver item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Planejamento e controle de obra: "a importância do planejamento e controle em obras de reformas hospitalares".

    Thumbnail
    Visualizar/Abrir
    FRANCISCA ADRIELLA_compressed.pdf (510.9Kb)
    Data
    2021
    Autor
    Martins, Francisca Adriella de Oliveira
    Metadata
    Mostrar registro completo
    Resumo
    Hospital works show great constructive particularity as they are environments that need specific care. In a health care unit, it is not possible to carry out works at any time, requiring good planning in order to mitigate interference in hospital activities. The hospital is a living work, as we can never determine its structure definitively over the years, as medicine is in constant evolution, making it necessary to update its structure and equipment over time. Some architectural and constructive solutions already foresee this expansion/innovation in the act of elaborating a hospital project, which facilitate the insertion of these new medical solutions. The present work presents an exploratory case study, whose methodology was the qualitative analysis of a work that took place in a private hospital. The objective of this work is to present a process of planning and control of hospital renovation work through a well-aligned connection between "work x hospital operation", with delivery deadlines and area releases (even if partial) for the beginning of activities. As with all planning prior to the start of the work (anticipation and scheduling of purchases of equipment with longer delivery times to minimize the risk of delays; hiring of special services; predictability of critical periods in health, as occurs here in Ceará in the 2nd quarter of the year virus period, which considerably increases the movement in hospital emergencies; scheduling of release phasing of areas that will be impacted by the renovation, among others). Keywords: Planning. Reform. Hospital. Expansion.
    URI
    http://repositorio.faculdadearidesa.edu.br/jspui/handle/hs826/231
    Collections
    • Trabalhos de Conclusão de Curso (TCC)

    DSpace software copyright © 2002-2016  DuraSpace
    Entre em contato | Deixe sua opinião
    Theme by 
    Atmire NV
     

     

    Navegar

    Todo o repositórioComunidades e ColeçõesPor data do documentoAutoresTítulosAssuntosEsta coleçãoPor data do documentoAutoresTítulosAssuntos

    Minha conta

    EntrarCadastro

    DSpace software copyright © 2002-2016  DuraSpace
    Entre em contato | Deixe sua opinião
    Theme by 
    Atmire NV