• Entrar
    Ver item 
    •   Página inicial
    • Graduação
    • Engenharia Civil
    • Trabalhos de Conclusão de Curso (TCC)
    • Ver item
    •   Página inicial
    • Graduação
    • Engenharia Civil
    • Trabalhos de Conclusão de Curso (TCC)
    • Ver item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Avaliação das falhas de quantitativos em uma obra de edificação pública utilizando ferramentas bim.

    Thumbnail
    Visualizar/Abrir
    4e704184221e8f6d4884a0b278f6bb96-TCC-2-ROBERTA-HORANA-15122023_compressed.pdf (757.5Kb)
    Data
    2023
    Autor
    Camelo, Roberta Horana Santos Barbosa
    Metadata
    Mostrar registro completo
    Resumo
    In the current competitive dynamics of the market, the crucial need for an accurate assessment of the costs involved in civil construction projects becomes evident. This assessment is conducted through the budgeting process. In the context of public works, the precision of quantities is crucial, directly influencing the accuracy of the budget. Starting the construction budget requires a detailed survey of the quantities of services and inputs, an essential preliminary step. This step is essential to improve efficiency in all construction sectors, reducing expenses and avoiding waste. Traditionally, quantitative surveying is based on detailed analysis of the project, technical specifications and construction plans. However, this method often demonstrates flaws, repeatedly affecting company decisions. This work aims to evaluate the use of BIM for extracting quantities and preparing a budget when compared with the public budget already made using the traditional method. For this, a case study was used and data collection was carried out through document handling. It was clear from the purchases made by the construction company and the BIM budget that it was more accurate, there were some discrepancies and only the masonry, flooring and covering services were analyzed. The methodology of this study will examine the use of BIM to extract quantities, making a comparison with what was obtained in AutoCAD. It is concluded that this study originated from the need to improve and optimize the collection of quantities using the BIM platform, with the aim of comparing this approach with manual extraction. Keywords: Crucial. Quantitative. Budget. Cost. BIM.
    URI
    http://repositorio.faculdadearidesa.edu.br/jspui/handle/hs826/347
    Collections
    • Trabalhos de Conclusão de Curso (TCC)

    DSpace software copyright © 2002-2016  DuraSpace
    Entre em contato | Deixe sua opinião
    Theme by 
    Atmire NV
     

     

    Navegar

    Todo o repositórioComunidades e ColeçõesPor data do documentoAutoresTítulosAssuntosEsta coleçãoPor data do documentoAutoresTítulosAssuntos

    Minha conta

    EntrarCadastro

    DSpace software copyright © 2002-2016  DuraSpace
    Entre em contato | Deixe sua opinião
    Theme by 
    Atmire NV