• Entrar
    Ver item 
    •   Página inicial
    • Graduação
    • Engenharia Civil
    • Trabalhos de Conclusão de Curso (TCC)
    • Ver item
    •   Página inicial
    • Graduação
    • Engenharia Civil
    • Trabalhos de Conclusão de Curso (TCC)
    • Ver item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Aplicação do bim no planejamento de obras: um estudo de caso em eusébio – ce.

    Thumbnail
    Visualizar/Abrir
    19a4eb31ad1fad2cbda37f623dc8400a-APLICACAO-DO-BIM-NO-PLANEJAMENTO-DE-OBRAS-UM-ESTUDO-DE-CASO-EM-EUSEBIO-CE_compressed.pdf (633.6Kb)
    Data
    2023
    Autor
    Ribeiro, Francisco Alan Nunes
    Metadata
    Mostrar registro completo
    Resumo
    Construction planning is an essential step in the execution of projects, since from there, the tasks to be performed are designed in order to optimize construction. Several methodologies were designed to add more value and ensure greater assertiveness in the construction of buildings, such as BIM 4D. This work deals with a case study on the application of BIM in the construction planning stage, with the aim of identifying the benefits and difficulties during the process. Using Navisworks computational software, the activities of the executive schedule developed in the case study were integrated with the virtual model of the enterprise, thus assigning a variable time to the 3D project. Using the model associated with the planning of the work, a simulation of the construction of the project in question was carried out and presented to the production teams. In addition to the simulation, the project managers were given the balance line of the activities to be carried out, the curve, the labor histogram and the average term goals to be achieved. At the end of the work, we recommend a positive contribution on the use of BIM, which enabled the work teams to have a greater understanding of the project's plan of attack, suggesting the probability of non-adherence to the planning. However, the greatest difficulties were encountered in the process of preparing the 4D simulation, which were related to the incompatibility of some restrictions attributed to the elements of the virtual model with the work packages defined in the executive planning. Keywords: Construction planning. Bim 4D. Case study.
    URI
    http://repositorio.faculdadearidesa.edu.br/jspui/handle/hs826/341
    Collections
    • Trabalhos de Conclusão de Curso (TCC)

    DSpace software copyright © 2002-2016  DuraSpace
    Entre em contato | Deixe sua opinião
    Theme by 
    Atmire NV
     

     

    Navegar

    Todo o repositórioComunidades e ColeçõesPor data do documentoAutoresTítulosAssuntosEsta coleçãoPor data do documentoAutoresTítulosAssuntos

    Minha conta

    EntrarCadastro

    DSpace software copyright © 2002-2016  DuraSpace
    Entre em contato | Deixe sua opinião
    Theme by 
    Atmire NV