• Entrar
    Ver item 
    •   Página inicial
    • Pós-graduação
    • Engenharia Consultiva
    • Trabalhos de Conclusão de Curso (TCC)
    • Ver item
    •   Página inicial
    • Pós-graduação
    • Engenharia Consultiva
    • Trabalhos de Conclusão de Curso (TCC)
    • Ver item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    O uso da metodologia BIM no planejamento e controle em canteiros de obras.

    Thumbnail
    Visualizar/Abrir
    FÁBIO BRUNO SANTOS DE CARVALHO_2022.pdf (579.1Kb)
    Data
    2022
    Autor
    Carvalho, Fábio Bruno Santos de
    Metadata
    Mostrar registro completo
    Resumo
    BIM technology has come to assist and improve the processes of companies in the field of Architecture, Engineering and Construction that seek new ways to minimize expenses and maximize the return on their investments. One of the phases of construction projects that makes this happen is a good planning and control of the work, which both must occur cohesively and assertively. Thus, the present work seeks to show the use of BIM technology, through the modeling of projects, and can assist in the management process of the work. Planning is a process of extreme importance when it comes to improving the production and quality of the final product, thus, it has become an essential tool within a work. Therefore, the study aims to analyze qualitatively the planning and control of a gas station integrated to AutoCAD and MS Project software in order to perform an efficient and organized production management. In the construction studied it was possible to conclude the efficiency of the software most mentioned in the job interviews for engineers The MS Project, as a tool for planning and control of works in the construction industry, It allows a visualization of easy understanding of the sequencing of activities, contributing to the decision making and execution of the work; thus, the research has shown satisfactory results achieved, in which the programs presented important quantitative and qualitative data on the construction site. Keywords: Planning, Management, BIM, Ms Project and Results.
    URI
    http://repositorio.faculdadearidesa.edu.br/jspui/handle/hs826/172
    Collections
    • Trabalhos de Conclusão de Curso (TCC)

    DSpace software copyright © 2002-2016  DuraSpace
    Entre em contato | Deixe sua opinião
    Theme by 
    Atmire NV
     

     

    Navegar

    Todo o repositórioComunidades e ColeçõesPor data do documentoAutoresTítulosAssuntosEsta coleçãoPor data do documentoAutoresTítulosAssuntos

    Minha conta

    EntrarCadastro

    DSpace software copyright © 2002-2016  DuraSpace
    Entre em contato | Deixe sua opinião
    Theme by 
    Atmire NV