Use este identificador para citar ou linkar para este item: http://repositorio.faculdadearidesa.edu.br/jspui/handle/hs826/341
Título: Aplicação do bim no planejamento de obras: um estudo de caso em eusébio – ce.
Autor(es): Ribeiro, Francisco Alan Nunes
Palavras-chave: Planejamento de Obras
BIM
Data do documento: 2023
Editor: Faculdade Ari de Sá
Citação: Aplicação do bim no planejamento de obras: um estudo de caso em eusébio – ce / Francisco Ribeiro. - 2023.
Resumo: Construction planning is an essential step in the execution of projects, since from there, the tasks to be performed are designed in order to optimize construction. Several methodologies were designed to add more value and ensure greater assertiveness in the construction of buildings, such as BIM 4D. This work deals with a case study on the application of BIM in the construction planning stage, with the aim of identifying the benefits and difficulties during the process. Using Navisworks computational software, the activities of the executive schedule developed in the case study were integrated with the virtual model of the enterprise, thus assigning a variable time to the 3D project. Using the model associated with the planning of the work, a simulation of the construction of the project in question was carried out and presented to the production teams. In addition to the simulation, the project managers were given the balance line of the activities to be carried out, the curve, the labor histogram and the average term goals to be achieved. At the end of the work, we recommend a positive contribution on the use of BIM, which enabled the work teams to have a greater understanding of the project's plan of attack, suggesting the probability of non-adherence to the planning. However, the greatest difficulties were encountered in the process of preparing the 4D simulation, which were related to the incompatibility of some restrictions attributed to the elements of the virtual model with the work packages defined in the executive planning. Keywords: Construction planning. Bim 4D. Case study.
URI: http://repositorio.faculdadearidesa.edu.br/jspui/handle/hs826/341
Aparece nas coleções:Trabalhos de Conclusão de Curso (TCC)



Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.